Kings Post Project
A restricted access site at the Barbican with an MC80 rig of 11 ton craned to carry out the construction of a #kingpostretainingwall.
A restricted access site at the Barbican with an MC80 rig of 11 ton craned to carry out the construction of a #kingpostretainingwall.
A delivery of brand new 300mm Augers for #restrictedaccesspiling for drilling through cohesive soils and rock, for a project in #London.