Interexion, Brick Lane, London

ValueDuration
£80k1 weeks

Interexion is a leading provider of colocation data centre services across Europe supporting over 1,600 customers in over 40 Data Centres. Sheppard Piling won the contract to install x 6 no piles for a crane mat in advance of a new build in Brick Lane, London.

Piling requirements

Due to the loaded piles at a depth of 28m we chose to use the Rotary Auger Bored Piling method. The diameter of the piles is 500mm, with 600mm diameter temporary casings up to a depth of 12m.