Bricklane Bore
3 x days at #Bricklane,London and using a #Soilmec R312 39 ton rig to bore and concrete 500mm Rotary Auger Bored Piles to a depth of 28.5m
3 x days at #Bricklane,London and using a #Soilmec R312 39 ton rig to bore and concrete 500mm Rotary Auger Bored Piles to a depth of 28.5m
Preparing the team to install 44 no, 450mm diameter piles in a new build 8 x storey mixed use development in #BoroughHighStreet in #London
Restricted access piling using a #Soilmec210 and CFA config. We have reduced site days from 20 to 7 which cumulates in a massive saving.
On site in Watford, North London. A Techno Drill TD308 was used to install 15 300mm piles, 8m deep, for a property extension. Thanks Master Mix Concrete Ltd for supplying concrete.
We are working at Sevenoaks on an high-end residential instruction for a period of two weeks. The project brief is to build a contiguous piled wall using 450mm diameter piles to allow for an excavation up to 3.0 metres in depth. We have deployed a 40 ton Soilmec Ltd - Drilling and Foundation Equipment rig [...]
Sheppard Piling were contracted to a residential development at Brookmans Park to carry out a CFA Piling instruction of 70 piles of a 300mm diameter into a clay base.. The duration of the project was approximately one week.
Happy New Year from Sheppard Piling. To our clients and friends, thanks for all your support in 2016. We are looking forward to continuing building foundations together with you in 2017.
The boss leads the way as we get involved in a #mini piling project in #Epsom.