Loading...

News

Home/News
News2019-07-30T09:48:03+01:00

All the latest industry news and our projects.

Bricklane Bore

February 20th, 2017|

3 x days at #Bricklane,London and using a #Soilmec R312 39 ton rig to bore and concrete 500mm Rotary Auger Bored Piles to a depth of 28.5m

Borough High Street Project

February 6th, 2017|

Preparing the team to install 44 no, 450mm diameter piles in a new build 8 x storey mixed use development in #BoroughHighStreet in #London

Timesaving Team

February 3rd, 2017|

Restricted access piling using a #Soilmec210 and CFA config. We have reduced site days from 20 to 7 which cumulates in a massive saving.

Sevenoaks Project

January 16th, 2017|

We are working at Sevenoaks on an high-end residential instruction for a period of two weeks. The project brief is to build a contiguous piled wall using 450mm diameter piles to allow for an excavation [...]

Load More Posts

Weymouth Office (Accounts)
Unit 28, Basepoint Business Centre, Weymouth, Dorset, DT4 7BS

T: 01305 897 828

Head Office:
Silver Reach Farm, Long Reach, Ockham, GU23 6PF

T: 01372 232 090
E: [email protected]