Kings Post Project
A restricted access site at the Barbican with an MC80 rig of 11 ton craned to carry out the construction of a #kingpostretainingwall.
Exciting Deliveries
A delivery of brand new 300mm Augers for #restrictedaccesspiling for drilling through cohesive soils and rock, for a project in #London.
Bricklane Bore
3 x days at #Bricklane,London and using a #Soilmec R312 39 ton rig to bore and concrete 500mm Rotary Auger Bored Piles to a depth of 28.5m
Borough High Street Project
Preparing the team to install 44 no, 450mm diameter piles in a new build 8 x storey mixed use development in #BoroughHighStreet in #London
Timesaving Team
Restricted access piling using a #Soilmec210 and CFA config. We have reduced site days from 20 to 7 which cumulates in a massive saving.
Watford, North London Project
On site in Watford, North London. A Techno Drill TD308 was used to install 15 300mm piles, 8m deep, for a property extension. Thanks Master Mix Concrete Ltd for supplying concrete.
Sevenoaks Project
We are working at Sevenoaks on an high-end residential instruction for a period of two weeks. The project brief is to build a contiguous piled wall using 450mm diameter piles to allow for an excavation [...]
Brookmans Park Project
Sheppard Piling were contracted to a residential development at Brookmans Park to carry out a CFA Piling instruction of 70 piles of a 300mm diameter into a clay base.. The duration of the project was approximately one [...]
Happy New Year
Happy New Year from Sheppard Piling. To our clients and friends, thanks for all your support in 2016. We are looking forward to continuing building foundations together with you in 2017.
Weymouth Office (Accounts)
Unit 28, Basepoint Business Centre, Weymouth, Dorset, DT4 7BS
T: 01305 897 828
Head Office:
Silver Reach Farm, Long Reach, Ockham, GU23 6PF
T: 01372 232 090
E: [email protected]